Hand a research pipeline's cited answer to Artiwright, get the deck

The last step of a research pipeline. An analysis agent answered leadership's launch question from six sources, with citations; Artiwright's agent turned that answer into a six-slide brief in two minutes, every figure as given and the sources on every slide.

Who
A product team's research pipeline in Google ADK, with artiwright_agent as its last step, on OpenAI gpt-6.1-sol
Runs in
Google ADK
Hands over
.pptxcold-climate-heat-pump-leadership-brief.pptx
6 slidesin 1 file, opened in Office
10 turns, 2 minone agent run in Google ADK on gpt-6.1-sol, unedited

The ask

Our research step answered leadership's question about launching the cold-climate heat pump; its cited answer is in cited_answer.md. Turn it into a six-slide brief for Thursday's product leadership meeting: the recommendation first, then the market, what incentives do for buyers, the competition and our position, and the risks and launch gates. Use only the figures in the answer, keep its citations on each slide, and list the references on the last slide. Coast theme.

A product team's research pipeline in Google ADK, with artiwright_agent as its last step, on OpenAI gpt-6.1-sol

Many teams already have an agent pipeline that answers questions: it checks the request, plans, retrieves, analyzes and attaches citations. What it can't do is hand leadership a deck. Here Artiwright is the last step: the pipeline passes its validated, cited answer, and Artiwright's agent makes the file.

The research step was a plain Google ADK agent on gpt-6.1-sol: it answered from six retrieved sources (made-up data) in 35 seconds, citing every figure. That answer is what was handed over. Artiwright's artiwright_agent, on the same model, got the request and the answer, nothing else, and built, checked and saved the deck.

What they handed over

Made-up data in the shape of a real export. Download it and try the ask yourself.

What came out

cold-climate-heat-pump-leadership-brief.pptxPowerPoint · 6 slides · 43 KB
Download

Screenshots exported by PowerPoint and Excel.

What the agent noticed

Two minutes, eleven calls

With the analysis already done, Artiwright's part is layout and checking: 11 tool calls, about two minutes and 164K tokens, roughly $0.35 on gpt-6.1-sol.

Every figure as given, every slide cited

Each number on the slides is one from the cited answer, and each slide carries the citations for what it shows, with the references on the last slide. Nothing was rounded, combined or added.

It kept the answer's caveats

The answer said where the sources were silent: no launch-year forecast, no customer commitments, no comparable specs for our prototype. The deck keeps those gaps on the slides rather than smoothing them over.

Build it yourself

Our research step answered leadership's question about launching the cold-climate heat pump; its cited answer is in cited_answer.md. Turn it into a six-slide brief for Thursday's product leadership meeting: the recommendation first, then the market, what incentives do for buyers, the competition and our position, and the risks and launch gates. Use only the figures in the answer, keep its citations on each slide, and list the references on the last slide. Coast theme.

Set Artiwright up in your app first: Quickstart for AI apps, Google ADK, LangGraph, Node.js.

How it got thereSee all 11 calls the agent made, what lint found and the finalize report

The run

One real session in Google ADK (gpt-6.1-sol), with only Artiwright's tools and the paths of the files above. Nothing below is edited: every call the agent made, what came back, and the renders it looked at.

  1. artiwright_help
    {
      "query": "recipes",
      "maxChars": 18000
    }
    20 recipes: compose(slide, h(Name, props)). Props (? = optional):
      TitleSlide { title, subtitle?, eyebrow?, date? }  Opening slide: large title, subtitle and a date, over an accent rule.
      SectionDivider { title, number?: string | number, subtitle? }  Section divider on an accent background.
      TitleBullets { title, bullets: Bullet[] (text, sub?), eyebrow? }  Title and bullet points (with optional sub-points).
      TwoColumns { title, eyebrow?, left: { heading?: string; bullets: Bullet[] } (text, sub?), right: { heading?: string; bullets: Bullet[] } (text, sub?) }  Two columns of points, each with an optional heading.
      KpiCards { title, kpis: Kpi[] (label, value, delta?, trend?), eyebrow?, note? }  Two to four KPI cards with a value, label and change.
      BigNumber { value, label, context?, eyebrow? }  One number that tells the story.
      Quote { quote, author, role? }  A customer or expert quote with attribution.
      ImageText { title, image: ImageOptions["source"], alt, bullets?: Bullet[] (text, sub?), body?, side?: "left" | "right", eyebrow? }  A picture beside text (left or right).
      ChartTakeaway { title, eyebrow?, chart: Omit<ChartProps, keyof LayoutProps | "categories"> & { categories?: ChartProps["categories"]; format?: string }, takeaways }  A chart with the takeaways beside it.
      ComparisonTable { title, eyebrow?, rows: Array<Array<string | number>>, note? }  A comparison or data table with an optional note.
      Agenda { items, current?, title? }  Numbered agenda; the current item stands out.
      Timeline { title, eyebrow?, steps: Array<{ date: string; title: string; text?: string }> }  Milestones on a horizontal line.
      ProcessSteps { title, eyebrow?, steps: Array<{ title: string; text?: string }> }  Numbered process steps as cards.
      TeamGrid { title, eyebrow?, people: Array<{ name: string; role: string; photo?: ImageOptions["source"] }> }  People with photos (or initials), names and roles.
      ProsCons { title, eyebrow?, pros, cons }  Pros and cons in two tinted panels.
      Matrix2x2 { title, eyebrow?, xLabel, yLabel, quadrants: [Quadrant, Quadrant, Quadrant, Quadrant] (title, text?, highlight?) }  A 2×2 matrix with axis labels.
      BeforeAfter { title, eyebrow?, before: { heading?: string; points: string[] }, after: { heading?: string; points: string[] } }  Before and after, with an arrow between.
      PricingTiers { title, eyebrow?, tiers: Array<{ name: string; pr
    …
  2. I’ll build a six-slide Coast-theme brief with the conditional recommendation first, citations on every slide, and references on the final slide. I’ll keep the source’s key limitation prominent: its figures are explicitly made-up scenario data, not verified market evidence.

  3. artiwright_help
    {
      "query": "slide.charts.add, TableOptions, guide themes",
      "maxChars": 19000
    }
    slide.charts.add: add(type: ChartType, options: ChartOptions): Chart
    Adds a native, editable chart. "column" is vertical bars, "bar" horizontal bars:
    `charts.add("column", { frame, categories: ["Q1", "Q2"], series: [{ name: "ARR", values: [4, 6] }] })`.
    
    ChartType:
      Values: column, bar, line, area, pie, doughnut, scatter, bubble, radar, stock, waterfall, funnel, treemap, sunburst, histogram, pareto, boxWhisker, pieOfPie, barOfPie, surface, contour
    
    ChartOptions:
      frame: Frame
      name?: string
      alt?: string
      categories?: Array<string | number | string[]>  Category labels (not used by scatter and bubble charts).
      series: ChartSeriesInput[]
      title?: string | { text: string; style?: string | TextStyle; overlay?: boolean }
      legend?: | false | LegendPosition | { position?: LegendPosition; overlay?: boolean; style?: string | TextStyle }  Position, false to hide, or options.
      dataLabels?: boolean | DataLabelsInput  Labels on every series.
      stacked?: boolean | "percent"  Column, bar, line and area charts: stack series, or stack to 100%.
      axes?: { x?: AxisInput; y?: AxisInput; y2?: AxisInput }  y2: the secondary value axis on the right, for series with axis: "secondary".
      gap?: number  Space between bar groups, percent of a bar's width (0–500).
      overlap?: number  Bar overlap within a group, percent (-100–100).
      holeSize?: number  Doughnut hole, percent of the diameter (10–90).
      firstSliceAngle?: number  Pie and doughnut rotation in degrees.
      varyColors?: boolean  A different color for every point.
      radarStyle? (marker | filled | lines)
      blanks? (gap | zero | span)  How gaps draw: leave a gap, drop to zero, or connect across.
      style?: string | TextStyle  Default text for the chart: font, size, color.
      background?: string
      border?: string | LineOptions
      plotBackground?: string
      upDownBars?: boolean  Stock charts with four series (open, high, low, close).
      highLowLines?: boolean
      totals?: number[]  Waterfall: indexes of the points that are totals (full bars from zero), e.g. [0, 4].
      connectorLines?: boolean  Waterfall: lines joining the bars (default true).
      parentLabels? (overlapping | banner | none)  Treemap: parent labels (default "overlapping").
      bins?: number | { count?: number; width?: number }  Histogram: the number of bins, or their width (default: automatic).
      threeD?: boolean  Column, bar, line, area and pie charts drawn in 3D.
      spli
    …
  4. artiwright_runerror
    const ids=[];
    function text(s,name,t,x,y,w,h,size=24,color='tx1',bold=false){return s.shapes.add({name,geometry:'textbox',frame:{x,y,w,h},text:t,textStyle:{font:'Aptos',size,color,bold},textBox:{valign:'middle'}});}
    function box(s,name,t,x,y,w,h,size=24,fill='bg2',color='tx1',bold=false){return s.shapes.add({name,geometry:'roundRect',frame:{x,y,w,h},fill,line:{color:fill,width:0},text:t,textStyle:{font:'Aptos',size,color,bold},textBox:{valign:'middle',padding:20}});}
    function base(title,kicker,cites){const s=deck.slides.add();ids.push(s.id);text(s,'section',kicker.toUpperCase(),64,30,1152,30,16,'accent1',true);text(s,'headline',title,64,78,1152,100,36,'tx1',true);s.shapes.add({geometry:'rect',frame:{x:64,y:628,w:1152,h:2},fill:'accent1',line:{color:'accent1',width:0}});text(s,'citations',cites,64,640,1152,27,15);text(s,'scenario-disclaimer','Made-up source data • Scenario planning only; not verified market evidence.',64,674,1152,24,14,'tx1');return s;}
    let s=base('Prepare a conditional launch—not a full production commitment.','Thursday • Product leadership • Recommendation','Sources: [1][2][3][6]. Scenario limitation: [1]–[6].');
    box(s,'decision','PROCEED TOWARD LAUNCH NEXT YEAR',64,193,1152,74,26,'accent1','bg1',true);
    box(s,'focus','FOCUS\nNortheast + Upper Midwest\nDemand is regionally concentrated. [1]',64,290,360,187,24);
    box(s,'prove','PROVE\nQualification + field reliability\nLab results support eligibility work. [2][6]',448,290,360,187,24);
    box(s,'commit','SECURE\nInstaller + delivery commitments\nRamp Dayton only after demand is credible. [3][6]',832,290,384,187,24);
    text(s,'decision-boundary','Approve launch preparation now; reserve the production decision until the gates are met.',64,505,1152,80,29,'accent1',true);
    s=base('Growth supports a focused launch, but not a full-capacity ramp.','Market • Demand and regional focus','Sources: [1] shipment history, forecasts and regional mix; [3][5] demand signals; [6] capacity.');
    s.charts.add('column',{name:'shipment-chart',frame:{x:64,y:194,w:620,h:380},title:'US residential heat pump shipments (million)',categories:['2024','2025','2026 forecast','2028 forecast'],series:[{name:'Units (million)',values:[4.1,4.6,5.1,6.0],fill:'accent1'}],legend:false,dataLabels:true,axes:{y:{min:0}},style:{font:'Aptos',size:18}});
    box(s,'regional-focus','22% of all shipments\n38% of cold-climate shipments\nNortheast + Upper Midwest, 2025 [1]',720,194,496,137,25);
    box(s,'category-growth','Cold-climate share: 5% → 9%\n2023 → 2025; models rated to −15°F [1]',720,350,496,100,24);
    box(s,'capacity-caution','40,000-unit capacity ≠ proven demand\nNo launch-year (2027) forecast or customer commitments. [1][6]',720,470,496,133,23,'bg2');
    text(s,'market-note','2025 shipments grew 11%; 63% of installers saw more inquiries. [1][3]',64,584,625,35,18);
    s=base('Incentives can ease upfront cost; a universal net price is unsupported.','Buyer economics • Eligibility comes first','Sources: [2] tax credit, rebates and threshold; [3] buyer cost barrier and quotes; [5] utilities; [6] lab COP.');
    text(s,'cost-context','58% cite upfront cost as the sales barrier; average cold-climate installed quote: $17,800. [3]',64,183,1152,63,25);
    box(s,'tax-credit','TAX CREDIT [2]\n30% of qualifying installed cost\nUp to $2,000 per year\nThrough 2032',64,266,360,190,24);
    box(s,'income-rebate','INCOME-QUALIFIED [2]\nUp to $8,000 at point of sale\n19 states launched programs\nBy September 2026',448,266,360,190,24);
    box(s,'utility-rebate','UTILITY SUPPORT [5]\nTypically $1,000–$3,000\nPer home, in 14 states\nLocal terms must be checked',832,266,384,190,24);
    box(s,'qualification','Lab COP: 1.9 at 5°F vs. 1.75 qualifying threshold. Final product qualification is unconfirmed. [2][6]',64,478,1152,74,24,'accent1','bg1',true);
    text(s,'price-caution','Do not assume stacking, buyer eligibility or a final out-of-pocket price. [2][5]',64,568,1152,44,23);
    s=base('Availability is a potential differentiator—not a proven advantage.','Competition • Our position','Sources: [4] competitor scan; [6] prototype planning; [3][4][6] availability and delivery caveats.');
    s.tables.add({name:'competition-table',frame:{x:64,y:190,w:1152,h:266},columns:['1.35fr','1.1fr','1.35fr','2.5fr'],rows:[['Product','Cold-climate models','Lowest rated temp.','Equipment price / planned list'],['Aldenmark','4','−22°F','$6,900 typical equipment'],['Coreline','2','−13°F','$5,400 typical equipment'],['Veyra','3','−15°F','$6,200 typical equipment'],['Our prototype','Not supplied','Not supplied','$6,400 planned list']],style:'striped',textStyle:{font:'Aptos',size:22},headerStyle:{font:'Aptos',size:21,bold:true},padding:12});
    text(s,'comparison-caveat','List and typical equipment prices are not necessarily comparable; superior cold-weather performance is not established. [4][6]',64,472,1152,55,22);
    box(s,'availability-gap','9-week cold-climate lead time vs. 3 weeks for standard models (Q3 2026).\n27% of cold-state installers lost a sale to unavailability; our delivery lead time is unproven. [3][4][6]',64,544,1152,75,22,'bg2');
    s=base('Release the launch only after the execution gates are met.','Risks • Evidence required before ramp','Sources: [2][3][5] affordability; [3][6] reliability; [4][6] positioning; [3][4][6] delivery; [6] economics.');
    s.tables.add({name:'launch-gates',frame:{x:64,y:188,w:1152,h:346},columns:['1.2fr','2.15fr','2.8fr'],rows:[['Risk','What remains unresolved','Launch gate'],['Affordability','Installed cost and buyer eligibility','Confirm qualification and local incentive / pricing terms. [2][3][5]'],['Performance','44% cite cold-weather doubts','Validate field performance and reliability. [3][6]'],['Positioning','Comparable low-temperature specs missing','Complete specs and defensible sales claims. [4][6]'],['Delivery + demand','No credible delivery or volume commitments','Secure installer demand and customer delivery commitments. [3][4][6]'],['Economics','31% estimated gross margin ≠ profitability','Validate launch costs, warranty, operating costs and break-even. [6]']],style:'striped',textStyle:{font:'Aptos',size:20},headerStyle:{font:'Aptos',size:21,bold:true},padding:10});
    box(s,'gate-decision','Dayton can build 40,000 units without new tooling. Do not ramp on capacity alone. [6]',64,557,1152,58,24,'accent1','bg1',true);
    s=base('Approve preparation; use these sources to close the launch gates.','References • Thursday decision','Citations retained from cited_answer.md. All supplied sources explicitly describe their data as made-up. [1]–[6]');
    box(s,'references-left','[1] Northbeam Energy Research\nUS Residential Heat Pump Outlook 2026\n\n[2] Federal incentive summary\n\n[3] Installer survey, Q2 2026\n(n = 412 HVAC contractors)',64,194,560,277,23);
    box(s,'references-right','[4] Competitor cold-climate lineup and pricing\nSeptember 2026\n\n[5] Utility program notes\n\n[6] Our product and plant notes',648,194,568,277,23);
    text(s,'source-limit','Scenario recommendation only—not a verified real-market investment conclusion. [1]–[6]',64,486,1152,51,24,'accent1',true);
    box(s,'next-step','THURSDAY ASK\nApprove focused launch preparation; return for production approval only after all gates are confirmed. [2][3][4][6]',64,551,1152,67,23,'bg2');
    return {slides:ids};
    {
      "ok": false,
      "error": {
        "name": "OptionsError",
        "message": "shapes.add: textBox: unknown option \"padding\". Did you mean \"insets\"?"
      },
      "logs": [],
      "created": [],
      "removed": [],
      "slides": 0,
      "version": 0,
      "lint": {
        "errors": 0,
        "warnings": 0
      },
      "theme": {
        "theme": "Coast",
        "source": "requested"
      }
    }
  5. artiwright_run
    const ids=[];
    function text(s,name,t,x,y,w,h,size=24,color='tx1',bold=false){return s.shapes.add({name,geometry:'textbox',frame:{x,y,w,h},text:t,textStyle:{font:'Aptos',size,color,bold},textBox:{valign:'middle'}});}
    function box(s,name,t,x,y,w,h,size=24,fill='bg2',color='tx1',bold=false){return s.shapes.add({name,geometry:'roundRect',frame:{x,y,w,h},fill,text:t,textStyle:{font:'Aptos',size,color,bold},textBox:{valign:'middle',insets:{left:20,right:20,top:12,bottom:12}}});}
    function base(title,kicker,cites){const s=deck.slides.add();ids.push(s.id);text(s,'section',kicker.toUpperCase(),64,30,1152,30,16,'accent1',true);text(s,'headline',title,64,78,1152,100,36,'tx1',true);s.shapes.add({geometry:'rect',frame:{x:64,y:628,w:1152,h:2},fill:'accent1'});text(s,'citations',cites,64,640,1152,27,15);text(s,'scenario-disclaimer','Made-up source data • Scenario planning only; not verified market evidence.',64,674,1152,24,14);return s;}
    let s=base('Prepare a conditional launch—not a full production commitment.','Thursday • Product leadership • Recommendation','Sources: [1][2][3][6]. Scenario limitation: [1]–[6].');
    box(s,'decision','PROCEED TOWARD LAUNCH NEXT YEAR',64,193,1152,74,26,'accent1','bg1',true);
    box(s,'focus','FOCUS\nNortheast + Upper Midwest\nDemand is regionally concentrated. [1]',64,290,360,187,24);
    box(s,'prove','PROVE\nQualification + field reliability\nLab results support eligibility work. [2][6]',448,290,360,187,24);
    box(s,'commit','SECURE\nInstaller + delivery commitments\nRamp Dayton after demand is credible. [3][6]',832,290,384,187,24);
    text(s,'decision-boundary','Approve launch preparation now; reserve the production decision until the gates are met.',64,505,1152,80,29,'accent1',true);
    s=base('Growth supports a focused launch, but not a full-capacity ramp.','Market • Demand and regional focus','Sources: [1] shipments, forecasts and regional mix; [3] demand signals; [6] capacity.');
    s.charts.add('column',{name:'shipment-chart',frame:{x:64,y:194,w:620,h:380},title:'US residential heat pump shipments (million)',categories:['2024','2025','2026 forecast','2028 forecast'],series:[{name:'Units (million)',values:[4.1,4.6,5.1,6.0],fill:'accent1'}],legend:false,dataLabels:true,axes:{y:{min:0}},style:{font:'Aptos',size:18}});
    box(s,'regional-focus','22% of all shipments\n38% of cold-climate shipments\nNortheast + Upper Midwest, 2025 [1]',720,194,496,137,25);
    box(s,'category-growth','Cold-climate share: 5% → 9%\n2023 → 2025; rated to −15°F [1]',720,350,496,100,24);
    box(s,'capacity-caution','40,000-unit capacity ≠ proven demand\nNo launch-year (2027) forecast or customer commitments. [1][6]',720,470,496,133,23);
    text(s,'market-note','2025 shipments grew 11%; 63% of installers saw more inquiries. [1][3]',64,584,625,35,18);
    s=base('Incentives can ease upfront cost; a universal net price is unsupported.','Buyer economics • Eligibility comes first','Sources: [2] incentives and threshold; [3] cost barrier and quotes; [5] utility rebates; [6] lab COP.');
    text(s,'cost-context','58% cite upfront cost as the sales barrier; average cold-climate installed quote: $17,800. [3]',64,183,1152,63,25);
    box(s,'tax-credit','TAX CREDIT [2]\n30% of qualifying installed cost\nUp to $2,000 per year\nThrough 2032',64,266,360,190,24);
    box(s,'income-rebate','INCOME-QUALIFIED [2]\nUp to $8,000 at point of sale\n19 states launched programs\nBy September 2026',448,266,360,190,24);
    box(s,'utility-rebate','UTILITY SUPPORT [5]\nTypically $1,000–$3,000\nPer home, in 14 states\nCheck local terms',832,266,384,190,24);
    box(s,'qualification','Lab COP: 1.9 at 5°F vs. 1.75 qualifying threshold. Final product qualification is unconfirmed. [2][6]',64,478,1152,74,24,'accent1','bg1',true);
    text(s,'price-caution','Do not assume stacking, buyer eligibility or a final out-of-pocket price. [2][5]',64,568,1152,44,23);
    s=base('Availability is a potential differentiator—not a proven advantage.','Competition • Our position','Sources: [4] competitor scan; [6] prototype planning; [3][4][6] availability and delivery caveats.');
    s.tables.add({name:'competition-table',frame:{x:64,y:190,w:1152,h:266},columns:['1.35fr','1.1fr','1.35fr','2.5fr'],rows:[['Product','Cold-climate models','Lowest rated temp.','Equipment price / planned list'],['Aldenmark','4','−22°F','$6,900 typical equipment'],['Coreline','2','−13°F','$5,400 typical equipment'],['Veyra','3','−15°F','$6,200 typical equipment'],['Our prototype','Not supplied','Not supplied','$6,400 planned list']],style:'striped',textStyle:{font:'Aptos',size:22},headerStyle:{font:'Aptos',size:21,bold:true},padding:12});
    text(s,'comparison-caveat','List and typical equipment prices are not necessarily comparable; superior cold-weather performance is not established. [4][6]',64,472,1152,55,22);
    box(s,'availability-gap','9-week cold-climate lead time vs. 3 weeks for standard models (Q3 2026).\n27% of cold-state installers lost a sale to unavailability; our lead time is unproven. [3][4][6]',64,544,1152,75,22);
    s=base('Release the launch only after the execution gates are met.','Risks • Evidence required before ramp','Sources: [2][3][5] affordability; [3][6] reliability; [4][6] positioning; [3][4][6] delivery; [6] economics.');
    s.tables.add({name:'launch-gates',frame:{x:64,y:188,w:1152,h:346},columns:['1.2fr','2.15fr','2.8fr'],rows:[['Risk','What remains unresolved','Launch gate'],['Affordability','Installed cost and buyer eligibility','Confirm qualification and local incentive / pricing terms. [2][3][5]'],['Performance','44% cite cold-weather doubts','Validate field performance and reliability. [3][6]'],['Positioning','Comparable low-temperature specs missing','Complete specs and defensible sales claims. [4][6]'],['Delivery + demand','No delivery or volume commitments','Secure installer demand and delivery commitments. [3][4][6]'],['Economics','31% estimated gross margin ≠ profitability','Validate launch costs, warranty, operating costs and break-even. [6]']],style:'striped',textStyle:{font:'Aptos',size:20},headerStyle:{font:'Aptos',size:21,bold:true},padding:10});
    box(s,'gate-decision','Dayton can build 40,000 units without new tooling. Do not ramp on capacity alone. [6]',64,557,1152,58,24,'accent1','bg1',true);
    s=base('Approve preparation; use these sources to close the launch gates.','References • Thursday decision','Citations retained from cited_answer.md. All sources explicitly describe their data as made-up. [1]–[6]');
    box(s,'references-left','[1] Northbeam Energy Research\nUS Residential Heat Pump Outlook 2026\n\n[2] Federal incentive summary\n\n[3] Installer survey, Q2 2026\n(n = 412 HVAC contractors)',64,194,560,277,23);
    box(s,'references-right','[4] Competitor cold-climate lineup and pricing\nSeptember 2026\n\n[5] Utility program notes\n\n[6] Our product and plant notes',648,194,568,277,23);
    text(s,'source-limit','Scenario recommendation only—not a verified real-market investment conclusion. [1]–[6]',64,486,1152,51,24,'accent1',true);
    box(s,'next-step','THURSDAY ASK\nApprove focused preparation; return for production approval after all gates are confirmed. [2][3][4][6]',64,551,1152,67,23);
    return {slides:ids};
    {
      "ok": true,
      "value": {
        "slides": [
          "sl_P6N4CVKT",
          "sl_AYK3TVNW",
          "sl_E1HS1AS0",
          "sl_35E8P9YG",
          "sl_3ZB693D7",
          "sl_2P4DB79E"
        ]
      },
      "logs": [],
      "created": [
        "sl_P6N4CVKT",
        "sh_2FT9FXKA",
        "sh_W4WVWZ8K",
        "sh_VDGSXAPM",
        "sh_NZ0B15XS",
        "sh_6H8NB6PG",
        "sh_RATTM1A3",
        "sh_75RXZH29",
        "sh_F76Y3ZYE",
        "sh_5085GB0Z",
        "sh_N0W3RMA3",
        "sl_AYK3TVNW",
        "sh_3HCBQ79A",
        "sh_TZ8ATGYQ",
        "sh_AF1G4KR3",
        "sh_TWFGZ6FY",
        "sh_MBYRYP2S",
        "ch_K352HXNT",
        "sh_8H9N2ZJV",
        "sh_TYB217ZP",
        "sh_MYM8FAXX",
        "sh_3QA934K7",
        "sl_E1HS1AS0",
        "sh_7NHZ5XC8",
        "sh_EDF371J0",
        "sh_Y26F9NWA",
        "sh_3ZE53FN9",
        "sh_1BTJHD2A",
        "sh_C9QV1Y5K",
        "sh_Z04ED90F",
        "sh_HSYP1VPT",
        "sh_6NM5RN04",
        "sh_KN8896K5",
        "sh_F61DG36F",
        "sl_35E8P9YG",
        "sh_RWH4MBE0",
        "sh_HCFD39MC",
        "sh_13HGVBH5",
        "sh_SEVY2FZQ",
        "sh_Z62SVYHF",
        "tb_TVJ9RZ7G",
        "sh_D2RMRDGG",
        "sh_8WXK8P0H",
        "sl_3ZB693D7",
        "sh_F24SCKCY",
        "sh_0EHJHBGX",
        "sh_DEV0M4E0",
        "sh_6H1EX8J2",
        "sh_HV245W1P",
        "tb_T0DSPTZ2",
        "sh_BGMR6HJ2",
        "sl_2P4DB79E",
        "sh_9EXYW314",
        "sh_0KZH1T54",
        "sh_PE4XV7BW",
        "sh_1BDKFEQQ",
        "sh_DNRTZGWR",
        "sh_D21PYZT7",
        "sh_GVNH757Z",
        "sh_RF3WFVBR",
        "sh_GDXD8G3S"
      ],
      "removed": [],
      "slides": 6,
      "version": 1,
      "lint": {
        "errors": 20,
        "warnings": 1
      }
    }
  6. artiwright_render
    {}
    Contact sheet of 6 slides.1 image(s) rendered; they are attached to your next turn. Look at them before you continue.
  7. artiwright_lint
    {}
    {
      "ok": false,
      "errors": 20,
      "warnings": 1,
      "findings": [
        {
          "rule": "text/overflow",
          "message": "Text in \"citations\" runs past the bottom of its box.",
          "evidence": {
            "lines": 1,
            "boxHeight": 27,
            "textHeight": 23.1
          },
          "fix": "Shorten the text, make the box taller, or set textBox: { autofit: \"shrink\" }.",
          "severity": "error",
          "slide": "sl_P6N4CVKT",
          "slideIndex": 1,
          "id": "sh_NZ0B15XS"
        },
        {
          "rule": "text/overflow",
          "message": "Text in \"scenario-disclaimer\" runs past the bottom of its box.",
          "evidence": {
            "lines": 1,
            "boxHeight": 24,
            "textHeight": 21
          },
          "fix": "Shorten the text, make the box taller, or set textBox: { autofit: \"shrink\" }.",
          "severity": "error",
          "slide": "sl_P6N4CVKT",
          "slideIndex": 1,
          "id": "sh_6H8NB6PG"
        },
        {
          "rule": "text/overflow",
          "message": "Text in \"commit\" runs past the bottom of its box.",
          "evidence": {
            "lines": 5,
            "boxHeight": 187,
            "textHeight": 170.6
          },
          "fix": "Shorten the text, make the box taller, or set textBox: { autofit: \"shrink\" }.",
          "severity": "error",
          "slide": "sl_P6N4CVKT",
          "slideIndex": 1,
          "id": "sh_5085GB0Z"
        },
        {
          "rule": "text/overflow",
          "message": "Text in \"decision-boundary\" runs past the bottom of its box.",
          "evidence": {
            "lines": 2,
            "boxHeight": 80,
            "textHeight": 77.3
          },
          "fix": "Shorten the text, make the box taller, or set textBox: { autofit: \"shrink\" }.",
          "severity": "error",
          "slide": "sl_P6N4CVKT",
          "slideIndex": 1,
          "id": "sh_N0W3RMA3"
        },
        {
          "rule": "text/overflow",
          "message": "Text in \"citations\" runs past the bottom of its box.",
          "evidence": {
            "lines": 1,
            "boxHeight": 27,
            "textHeight": 23.1
          },
          "fix": "Shorten the text, make the box taller, or set textBox: { autofit: \"shrink\" }.",
          "severity": "error",
          "slide": "sl_AYK3TVNW",
          "slideIndex": 2,
          "id": "sh_TWFGZ6FY"
        },
        {
          "rule": "text/overflow",
          "message": "Text in \"scenario-disclaimer\" runs past the bottom of its box.",
          "evidence": {
            "lines": 1,
            "boxHeight": 24,
            "textHeight": 
    …
  8. artiwright_run
    const plain=['sh_NZ0B15XS','sh_6H8NB6PG','sh_TWFGZ6FY','sh_MBYRYP2S','sh_3ZE53FN9','sh_1BTJHD2A','sh_SEVY2FZQ','sh_Z62SVYHF','sh_6H1EX8J2','sh_HV245W1P','sh_1BDKFEQQ','sh_DNRTZGWR','sh_N0W3RMA3'];for(const id of plain)deck.resolve(id).update({textBox:{insets:{left:0,right:0,top:0,bottom:0}}});
    for(const id of ['sh_5085GB0Z','sh_Z04ED90F','sh_8WXK8P0H','sh_BGMR6HJ2','sh_GDXD8G3S'])deck.resolve(id).update({textBox:{insets:{left:20,right:20,top:0,bottom:0}}});
    deck.resolve('sh_EDF371J0').setText('Incentives ease upfront cost—not every buyer’s net price.');
    deck.resolve('sh_D2RMRDGG').update({frame:{x:64,y:487,w:1152,h:50},textStyle:{size:20},textBox:{insets:{left:0,right:0,top:0,bottom:0}}});
    return deck.lint();
    {
      "ok": true,
      "value": {
        "ok": true,
        "errors": 0,
        "warnings": 1,
        "findings": [
          {
            "rule": "layout/overlap",
            "message": "Text in \"gate-decision\" overlaps the table \"launch-gates\".",
            "evidence": {
              "with": "tb_T0DSPTZ2",
              "overlap": [
                87,
                566,
                922,
                9
              ]
            },
            "fix": "Move one of them, or put them in a stack if the overlap is intended.",
            "severity": "warn",
            "slide": "sl_3ZB693D7",
            "slideIndex": 5,
            "id": "sh_BGMR6HJ2"
          }
        ]
      },
      "logs": [],
      "created": [],
      "removed": [],
      "slides": 6,
      "version": 2,
      "lint": {
        "errors": 0,
        "warnings": 1
      }
    }
  9. artiwright_run
    deck.resolve('tb_T0DSPTZ2').update({textStyle:{font:'Aptos',size:19},padding:8});deck.resolve('sh_BGMR6HJ2').update({frame:{x:64,y:567,w:1152,h:50},textStyle:{font:'Aptos',size:22,bold:true,color:'bg1'}});return deck.lint();
    {
      "ok": true,
      "value": {
        "ok": true,
        "errors": 0,
        "warnings": 0,
        "findings": []
      },
      "logs": [],
      "created": [],
      "removed": [],
      "slides": 6,
      "version": 3,
      "lint": {
        "errors": 0,
        "warnings": 0
      }
    }
  10. artiwright_render
    {}
    Contact sheet of 6 slides.1 image(s) rendered; they are attached to your next turn. Look at them before you continue.
  11. artiwright_inspect
    {
      "kind": "text,chart,table",
      "maxChars": 22000
    }
    {"kind":"text","id":"sh_2FT9FXKA","slide":"sl_P6N4CVKT","name":"section","bbox":[64,30,1152,30],"text":"THURSDAY • PRODUCT LEADERSHIP • RECOMMENDATION","chars":46,"lines":1,"fontPx":16}
    {"kind":"text","id":"sh_W4WVWZ8K","slide":"sl_P6N4CVKT","name":"headline","bbox":[64,78,1152,100],"text":"Prepare a conditional launch—not a full production commitment.","chars":62,"lines":1,"fontPx":36}
    {"kind":"text","id":"sh_NZ0B15XS","slide":"sl_P6N4CVKT","name":"citations","bbox":[64,640,1152,27],"text":"Sources: [1][2][3][6]. Scenario limitation: [1]–[6].","chars":52,"lines":1,"fontPx":15}
    {"kind":"text","id":"sh_6H8NB6PG","slide":"sl_P6N4CVKT","name":"scenario-disclaimer","bbox":[64,674,1152,24],"text":"Made-up source data • Scenario planning only; not verified market evidence.","chars":75,"lines":1,"fontPx":14}
    {"kind":"text","id":"sh_RATTM1A3","slide":"sl_P6N4CVKT","name":"decision","bbox":[64,193,1152,74],"text":"PROCEED TOWARD LAUNCH NEXT YEAR","chars":31,"lines":1,"fontPx":26}
    {"kind":"text","id":"sh_75RXZH29","slide":"sl_P6N4CVKT","name":"focus","bbox":[64,290,360,187],"text":"FOCUS\nNortheast + Upper Midwest\nDemand is regionally concentrated. [1]","chars":70,"lines":4,"fontPx":24}
    {"kind":"text","id":"sh_F76Y3ZYE","slide":"sl_P6N4CVKT","name":"prove","bbox":[448,290,360,187],"text":"PROVE\nQualification + field reliability\nLab results support eligibility work. [2][6]","chars":84,"lines":4,"fontPx":24}
    {"kind":"text","id":"sh_5085GB0Z","slide":"sl_P6N4CVKT","name":"commit","bbox":[832,290,384,187],"text":"SECURE\nInstaller + delivery commitments\nRamp Dayton after demand is credible. [3][6]","chars":84,"lines":5,"fontPx":24}
    {"kind":"text","id":"sh_N0W3RMA3","slide":"sl_P6N4CVKT","name":"decision-boundary","bbox":[64,505,1152,80],"text":"Approve launch preparation now; reserve the production decision until the gates are met.","chars":88,"lines":2,"fontPx":29}
    {"kind":"text","id":"sh_3HCBQ79A","slide":"sl_AYK3TVNW","name":"section","bbox":[64,30,1152,30],"text":"MARKET • DEMAND AND REGIONAL FOCUS","chars":34,"lines":1,"fontPx":16}
    {"kind":"text","id":"sh_TZ8ATGYQ","slide":"sl_AYK3TVNW","name":"headline","bbox":[64,78,1152,100],"text":"Growth supports a focused launch, but not a full-capacity ramp.","chars":63,"lines":1,"fontPx":36}
    {"kind":"text","id":"sh_TWFGZ6FY","slide":"sl_AYK3TVNW","name":"citations","bbox":[64,640,1152,27],"text":"Sources: [1] shipments, f
    …
  12. artiwright_finalizecold-climate-heat-pump-leadership-brief.pptx
    {
      "file": "cold-climate-heat-pump-leadership-brief.pptx",
      "requirements": {
        "slideCount": 6,
        "nativeCharts": [
          "sl_AYK3TVNW"
        ],
        "nativeTables": [
          "sl_35E8P9YG",
          "sl_3ZB693D7"
        ],
        "lint": {
          "block": [
            "error",
            "warn"
          ]
        }
      }
    }
    {
      "ok": true,
      "blocking": [],
      "warnings": [],
      "checks": [
        {
          "step": 1,
          "code": "path",
          "ok": true
        },
        {
          "step": 2,
          "code": "size",
          "ok": true
        },
        {
          "step": 2,
          "code": "validate",
          "ok": true
        },
        {
          "step": 3,
          "code": "package",
          "ok": true
        },
        {
          "step": 4,
          "code": "slideCount",
          "ok": true
        },
        {
          "step": 4,
          "code": "nativeCharts",
          "ok": true
        },
        {
          "step": 4,
          "code": "nativeTables",
          "ok": true
        },
        {
          "step": 5,
          "code": "chartData",
          "ok": true
        },
        {
          "step": 6,
          "code": "lint",
          "ok": true
        },
        {
          "step": 7,
          "code": "reimport",
          "ok": true
        },
        {
          "step": 8,
          "code": "publish",
          "ok": true
        }
      ],
      "path": "~/Documents/Personal/paperwright/out/agent-runs-brief/research-brief/sessions/planner-c54444cf-bb26-49a5-ba88-445c3d3d02ea/outputs/cold-climate-heat-pump-leadership-brief.pptx",
      "sha256": "08bccc31dfa88df1071c588c330a91d1e2b5b7f68408cb6083d5f009ebfccb49",
      "bytes": 43678,
      "manifestPath": "~/Documents/Personal/paperwright/out/agent-runs-brief/research-brief/sessions/planner-c54444cf-bb26-49a5-ba88-445c3d3d02ea/outputs/cold-climate-heat-pump-leadership-brief.pptx.manifest.ndjson",
      "receiptPath": "~/Documents/Personal/paperwright/out/agent-runs-brief/research-brief/sessions/planner-c54444cf-bb26-49a5-ba88-445c3d3d02ea/.artiwright/receipts/cold-climate-heat-pump-leadership-brief.08bccc31dfa8.1791863393083.receipt.json"
    }Saved for the user as artifact 'cold-climate-heat-pump-leadership-brief.pptx' (version 0).
The agent's last message

[Download the six-slide brief](outputs/cold-climate-heat-pump-leadership-brief.pptx)

Built in the Coast theme, covering the recommendation, market, buyer incentives, competition, risks and launch gates, then references. Citations appear on every slide, and the made-up-data limitation remains explicit.

Includes an editable chart and tables. Validation passed with no errors or warnings.

Lint during the run

20 text boxes running over

The first build had 20 boxes whose text ran over and one overlap. The agent fixed them in two calls, looked again, and finalize passed with nothing to report.

  1. lint20 × Text overflows its box1 × Text overlaps

Finalize report

Nothing is published until these pass. Finalize checks the real file and never overwrites one.

How this example was made: the request above went to a Google ADK agent on gpt-6.1-sol, built with Artiwright's Python package, using agent-runs/framework_run.py. The files are what it finalized, opened in PowerPoint and Excel for the screenshots. Companies, people and figures are made up.